Yosemite Regional
Transportation Strategy -
A Regional Approach to a National Problem
|
INTRODUCTION
 Just seven miles long and scarcely a mile wide, Yosemite Valley is one of the most
beloved - and most visited - corners on earth. Visitation to the Valley has been growing
steadily for over fifteen years at a rate of about 4% annually. In 1995, visitation
reached a new peak of about 4.2 million, an increase of 75% over 1983 visitation. While
visitation has declined slightly since, that decrease can be directly attributed to both
fires and floods that eliminated many lodging opportunities and campsites within the
Valley.
Yosemite's growing popularity has come at a price. The vast majority of visitors
currently come with their cars. More visitors have led to more cars, which in turn has
created parking problems, traffic congestion within the park, and air pollution during
peak months. Most people travel to Yosemite to escape such "urban" ills, and
many find the same kinds of problems they do at home.
Many constraints prevent the region from accommodating more cars without increased
congestion. All roadways leading to Yosemite traverse steep terrain and sensitive
habitats. Extensive roadway widening would be cost prohibitive and environmentally
challenging. More importantly, Yosemite Valley's small size and limited developable land
constrains the construction of additional automobile parking there.
Maintaining convenient access to Yosemite, however, is critical to the economies of all
the communities surrounding the Park. Even without parking reductions, if the Park Service
were to fully implement its current limit of 6,017 vehicles in the Valley(1),
the region would suffer a projected loss of over $7 million annually(2).
More importantly, losses in the tourist sector would severely dampen the future economic
potential of all sectors of the gateway economies.
The interrelationship between access to the Park and the health of surrounding local
economies was emphasized in 1995, when overwhelming visitation during peak summer months
resulted in the Park's implementation of what it refers to as its "Restricted Access
Plan" or RAP. The plan calls for the closure of entrance gates to the Park when the
Valley is highly congested, and when demand for parking exceeds the slightly over 1,200
spaces available for day visitors(3) .
The press coverage of gate closures, and resulting chaos as travelers waited for hours
to access the Park created a backlash resulting in declines in tourism that were
especially difficult on local businesses, dependant on peak season travel. The need for an
alternative that would allow guaranteed access into the park without requiring additional
parking to be built within the very limited land area available within the Valley became a
mutual goal of both local communities and the National Park.
The objective of the YARTS process, then, is not only to provide additional
transportation choices for visitors, residents and employees traveling between gateway
communities and the park, but also to ensure the economic vitality of the gateway
communities. This is particularly challenging at Yosemite, where the regional system must
involve at least four rural counties with no history of local transit use, and must
include four primary access routes that are each dominated by travel from a different
major metropolitan area. The challenge is further complicated by the fact that the primary
roadway through the Park is also one of only a handful of routes through the Sierra Nevada
mountains, and must accommodate through traffic as well as park visitors.
Figure 1 shows the Yosemite region, including the five counties that originally founded
the YARTS process: Merced, Mariposa, Tuolumne, Mono and Madera.
Yosemite Area Regional Transportation Strategy Project Boundaries
|
HISTORY OF YARTS
In 1992, the Yosemite Area Regional Transportation Strategy group (YARTS) was
established through a Memorandum of Understanding, and included the five counties closest
to Yosemite National Park, the Park Service, Caltrans (the California State Highway
Department), the State Department of Tourism, and the US Forest Service. The Federal
Highway Administration (FHWA) was later added to the YARTS Board . The mission of the
group, stated in its original Memorandum of Understanding was: "to pursue through a
cooperative effort, improved transportation in the Yosemite region."
Under the Memorandum of Understanding, YARTS members identified four basic goals:
- Improve transportation service within the Yosemite region;
- Reduce dependence on the single family vehicle within the Yosemite region;
- Reduce air quality impacts in the Yosemite region; and
- Improve economic viability compatible with the character of the Yosemite region.
The YARTS mission has since been refined as follows:
"YARTS will provide a positive alternative method of access to Yosemite
National Park, carrying visitors, employees and residents. YARTS service is not intended
to replace auto access or trans-Sierra travel, but is intended to provide a viable
alternative that offers a positive experience, emphasizing comfort and convenience for
riders, while guaranteeing access into the Park."
A brief history of the YARTS organization is provided in Figure 2.
This cooperative forum has already achieved impressive results. Until 1996, YARTS was
essentially a discussion forum, without the funding needed for a serious study of
transportation options. An initial achievement was the implementation of the Yosemite Area
Traveler's Information System (YATI) combining changeable message signs, highway radio
information, a website and information kiosks, to create a real time messaging system that
may one day support a regional transit network.
Figure 2
Time Line of YARTS Milestones
DATE
|
EVENT
|
September
1980 |
General Management Plan adopted by
National Park Service
|
1992
|
YARTS MOU Signed
|
August 1992 |
Concession Service Plan approved by
Park Service including in-Park transportation services |
June
1995 |
Alternative
Transportation Modes Feasibility Study Vol IV (BRW Study) released. Recommends staging
area at Taft Toe, inside Yosemite Valley |
April 1996 |
Yosemite Transportation Symposium |
July
1, 1996 |
YATI system dedicated |
January
1997 |
Yosemite Floods |
June
4, 1997 |
YARTS Board votes to
develop & implement a bus system in near-term, and study feasibility of implementing a
rail system in the long-term |
May 1997 |
Flood Relief
Congess ratifies $21 million for emergency in-park transportation and restoration |
October
1997 |
YARTS
Phase I Completed
Established regional system goals, developed evaluation criteria, identified three
bus-based transportation alternatives. |
July 1997 |
YATI Receives Caltrans Excellence in
Transportation Award
for success in working with a wide variety of interest groups and public agencies |
June
1998 |
YARTS
Phase II Completed
Selected Preferred Alternative, developed Financial Plan, designed short- and long-term
implementation program,, identified need for a JPA. |
March 1999 |
Madera County leaves YARTS |
September
1999 |
YARTS Phase III
Detailed Implementation Planning Completed. Develop a detailed business plan, complete
final planning tasks, implement early-deployment service, and implement new organizational
structure. |
May 2000 |
Initiate Demonstration Service |
Concentrated activity on the transit plan began in 1996, when YARTS received funding
through a Congressional earmark to study the regional feasibility of alternative mode
access to Yosemite National Park. The initial study resulted in two key conclusions:
- A bus transit service is a viable alternative for providing improved access to Yosemite
National Park and the Yosemite region in the short term.
- A phased approach, which will allow service to be implemented incrementally, is the
region's preferred approach.
In addition, the study concluded that rail service may also be viable in the long term,
and recommended a rail feasibility study be conducted after completion of the bus
implementation study.
In January, 1997, during the initial YARTS study, a severe flood damaged a significant
amount of infrastructure in Yosemite Valley and permanently removed a number of camping
and parking locations within the Valley. The National Park Service's (NPS) need for a
flood recovery plan resulted in a focused land use plan for Yosemite Valley that would
implement the goals of the General Management Plan for Yosemite National Park. An initial
planning effort, the Valley Implementation Plan has now been expanded into a comprehensive
land use plan and environmental study, currently underway, known as the Yosemite Valley
Plan. This study, being conducted by the National Park, is independent of the YARTS plan,
but will both be informed by the regional transit study and will provide information vital
to YARTS implementation.
The combination of regional and federal planning efforts going on in parallel has
unfortunately resulted in increasing confusion, especially among local residents with a
history of distrust of the Park Service. This distrust led to the accusation that the
YARTS process was designed as a "tool" of the Park Service and their stated goal
of removing cars from the National Park(4). Madera County
resigned its position on the YARTS Management Board in early 1999, after significant
protest in that County suggested that the YARTS process was simply a first step in an
overall ban on autos in the Valley, which would have an obvious negative impact on local
economies.
While the loss of Madera County, and continued protest in some communities has slowed
implementation of YARTS service, planning is on-going for a May, 2000 demonstration of a
regional transit service.
YARTS PLANNING PRINCIPLES
Planning for a regional transit service among a skeptical constituency has been a
significant challenge for the local elected officials who comprise the majority of the
YARTS Management Board. To ensure local residents that the solution to this national
problem would not negatively impact local communities, the Management Board adopted
Planning Principles earlier in 1999.
Among the key principles included in this document:
Voluntary Service
- The YARTS system should be a voluntary
system that encourages people to take the bus as an easy alternative to driving.
Incentives
- Policies for encouraging ridership include
fare reductions for youths, seniors, local residents and Park/concessionaire employees, as
well as guaranteed access to all areas in the Park.
Convenience and Quality
- A reliable service with
convenient connections, generous service hours and clear schedules is essential. Locating
stops at key lodging locations will minimize the need to drive to intercept locations that
will require more time for development.
Exceptional Vehicles
- The YARTS buses should be very
comfortable. Suggested amenities include storage for large gear such as bicycles and
strollers, multi-channel audio programming, reclining seats with overhead storage for
small items, and large windows that make the most of the area's spectacular scenery.
Competitive Pricing
- Low fares should ensure that the bus
is cheaper than driving. Transit fares must compete with a $20 per vehicle admission to
Yosemite, which is currently good for 7 days.
Commuter Service
- Making YARTS a viable commute
alternative for Park and concessionaire employees will be vital, particularly in YARTS'
early stages. Expanded service hours during the peak season would assure that late-night
and early-morning shift workers would be able to utilize the service.
Seamless Marketing
- The YARTS ride should be synonymous
with the "Yosemite experience," with integrated admission tickets and bus fare
and widespread system marketing.
COOPERATION WITH THE NATIONAL PARK
The YARTS planning effort represents a unique forum for cooperation between the
National Park and its neighbors in the areas of transportation and access. This is a major
departure from past efforts in the region which often resulted in an "us-them"
struggle between gateway communities and the Park Service, and among the various gateways
themselves. By speaking with one voice the gateway communities have influenced park
service policies.
The YARTS planning process has recommended and the park has adopted several key
policies that will enhance YARTS chances for success:
A definition of transit service has been adopted that is distinct from tour bus
operations. Tour buses are viewed as part of the congestion
problem at Yosemite because they stop and idle at various attractions throughout the park,
unloading, loading and waiting for their group to return. The definition of a
"transit" trip includes regular stops outside of the park on a reliable
schedule, the ability to board the bus without a reservation, and, most important to the
park, a "stop, drop, and go" operation that does not involve waiting or idling
along the way.
Transit buses will be given "privileges" that are not given to either
tour buses or cars at the National Park. Beyond adopting the definition of a
transit bus, the Park has indicated that transit operators will be "sanctioned"
or permitted only through the YARTS process. Transit operators will receive priority
access to the park. Their "privileges" will include: elimination of the $300
vehicle entrance fee currently charged to tour buses; the ability to "jump
queues" at entrance gates; reduced entrance fees for individuals to no more than $3
per person and $6 per group; and the ability to stop at key attraction points throughout
the park and Valley.
An employee transportation program will be a high priority for the Park Service
and its concessionaire. Public input strongly suggested that the local
communities would not accept a transit service for its guests that did not also serve to
remove employee cars from the park. An additional impact of the Yosemite Valley Plan is
likely to be a reduction of employee housing units in the Valley, as well as a substantial
reduction in the number of parking spaces available to commuting employees, making
alternative transportation a critical part of the park's own plan. While no final decision
has been made, the Park is committed to providing a comprehensive approach to employee
transportation, making Yosemite a leader among national parks in this area.
The Park is committed to contributing to the funding of YARTS and to its
success. Over time, the Park has come to see YARTS as an integral part of its
future. As demand for access to the park continues to increase despite limited parking and
automobile infrastructure, YARTS has been recognized as the only way to maintain
visitation levels without further damaging the environment. The National Park Service is
committed to the YARTS process, and has agreed to provide funding support for YARTS to
ensure its success. Few National Parks in the country have funded transportation projects
outside of their boundaries.
This level of commitment has substantially changed the relationships between the
gateway counties and the National Park. While a few years of cooperation
can not eliminate a history of competing goals, the YARTS process offers the promise of a
closer relationship between the Park and its neighbors.
THE DEMONSTRATION PLAN
 Developing a transportation plan for the Yosemite region is a substantial challenge
that goes beyond geography and the number of jurisdictions involved. The
rural gateway counties have no history of public transit service, except for very small
focused transit systems that cater primarily to elders and persons with disabilities. In
fact, many local residents moved to the mountain communities to avoid urban ills they
associate with public transit
Other concerns raised by the public in numerous workshops and input sessions include:
Concern over "big government" approaches to solving problems.
Even those local constituents who believe congestion and access to Yosemite is a regional
problem are skeptical about heavy handed government solutions. They fear
that even a small transit service will be a precursor to a larger system that will require
riders to leave their cars behind, and will ultimately make Yosemite less appealing as a
tourist destination. A common refrain says that "if it was a good
idea, business would do it", and since there is only a very small transit market
today, transit must not be a good idea. Local residents expressed concern about grant
funding or public investment in what they see as a largely private concern, and they
expressed a belief that local jurisdictions would ultimately be made to pay for the
program.
Environmental Concern. Local residents are concerned that large bus
fleets, especially diesel powered fleets will have a negative impact on local
environments. The public cites recent California EPA findings which identify diesel
exhaust particulate emissions as a carcinogen.
Economic Concern. Local business owners expressed concern that YARTS
would ultimately become the only way to access the park, and suggest that the YARTS
process is a tool of the park service's plan to ban all cars from the Yosemite Valley.
Under these circumstances, business owners are concerned that visitors will stay away from
the region, rather than make the trip by transit.
The plan for transit service in the Yosemite region reflects the input received from
the public and balances their concerns with the need to meet the objectives established
for YARTS. The result is a proposal for a two-year demonstration program, which will begin
operation during the summer, 2000. Under this proposal, YARTS will not be the direct
provider of transit services, but will serve as a "brokering" agency,
establishing service criteria and providing subsidies as available to encourage higher
levels of service and lower fares than would be offered by private operators on their own.
The service will actually be provided by the private sector, who will negotiate with YARTS
to determine the final schedules and other operating details.
The demonstration project plan provides minimum and maximum service levels expected to
be operated during the two-year demonstration period. Minimum service levels presume that
no funding is available to subsidize service or reduce fares. A very modest program could
still be offered at "market rates" providing connecting services from Amtrak and
serving employees. Maximum service levels are estimated based on subsidy levels that would
reduce the cost per visitor to $5 for a round trip, including the park's gate fee, and
would eliminate the cash fare for employees. Higher levels of service can be offered under
this scenario, as demand will significantly increase.
The final level of service on each corridor will be negotiated with the actual service
providers through a request for proposal (RFP) process. RFPs are expected to be issued
during the fall of 1999 for a summer 2000 service implementation.
Figure 3 presents the service characteristics for minimum and maximum service levels on
each of the corridors that will receive demonstration transit service. Service will be
offered at bus stops identified by each jurisdiction, located conveniently to lodging
sites in the gateway communities. The initial target market will be lodgers who can leave
their car at their lodging location while visiting the park. Employees will also be
targeted, especially on Highway 140 where concentrations of employees exist. Highway 120
West is not included in the demonstration plan because Tuolumne County has not identified
bus stop locations at this time. Should those stops be added, additional transit service
would be offered from Groveland into the Park.
Figure 3
Demonstration Service Plan
Corridor |
Measure |
Minimum service |
Maximum service |
Highway 140 |
Communities served |
El Portal, Midpines, Mariposa, Catheys Valley, Merced |
El Portal, Midpines, Mariposa, Catheys Valley, Merced |
Total daily round trips |
6 |
14+ |
Hours |
6:00 a.m. to 8:30 p.m. |
5:00 a.m. to 11:00 p.m. |
Summer revenue hours |
2,100 |
5,500 |
Total summer (5) service cost (no fare recovery) |
$130,000 |
$260,000 |
Base frequency |
Limited midday service |
Hourly from El Portal and Mariposa |
Peak hour frequency |
Hourly from El Portal |
Half-hourly from El Portal |
Summer ridership |
8,000 |
19,000 |
Buses Required |
6 |
8 |
Cost per ride |
$16 |
$12 |
Highway 120 |
Communities served |
Tuolumne Meadows to Valley only (in-park service) |
Lee Vining to Tuolumne Meadows also |
Total daily round trips |
0 to Lee Vining 1 to Tuolumne Meadows |
2 to Lee Vining 4 to Tuolumne Meadows |
Hours |
9:00 a.m. to 6:00 p.m. |
9:00 a.m. to 6:00 p.m. |
|
n/a |
315 (does not include YCS service between Valley and
Tuolumne Meadows) |
|
Total summer service cost (no fare recovery) |
n/a |
$19,000 |
Base frequency |
n/a |
Peak only |
Peak hour frequency |
n/a |
2 round trips |
Summer ridership |
n/a |
2,700 |
Buses required |
0 |
2 |
Cost per ride |
n/a |
$8 |
Highway 41 |
Communities served |
Wawona, Yosemite West |
Wawona, Yosemite West |
Total daily round trips |
1 |
4 |
Hours |
9:00 a.m. to 7:00 p.m. |
9:00 a.m. to 7:00 p.m. |
Summer revenue hours |
600 |
1,200 |
Total summer service cost (no fare recovery) |
$12,000 |
$49,000 |
Base frequency |
Peak service only |
Peak service only |
Peak hour frequency |
One round trip a day |
Hourly peak service |
Summer ridership |
1,300 |
5,400 |
|
1 |
3 |
|
$9 |
$9 |
Summary All Corridors |
Total Daily Round Trips |
7 |
20 |
Buses required |
7 |
13 |
Service hours |
2,700 |
7,015 |
Summer ridership |
9,300 |
27,100 |
Total cost (summer) |
$142,000 |
$328,000 |
Average Cost/Rider |
$15.27 |
$12.10 |
The demonstration service is expected to operate for a two-year period, with increasing
performance expectations over the two years. Identifying criteria for evaluating the
demonstration service was critical to gaining support, because it demonstrated the fact
that service could be altered or terminated if it failed to meet expectations. The
recommended criteria for evaluating the demonstration are modest, ensuring that the
demonstration is not expected to perform at a level that could only be expected of a fully
developed and established system. The proposed performance criteria are presented in
Figure 4
.
Figure 4
Demonstration Service Performance Criteria
(9)
Performance
measure |
Applicability
to YARTS |
Minimum target
with no employee transportation or fare support |
Upper limit
with employee transportation and visitor fare support |
Total ridership |
Maximizing ridership is a central goal of YARTS. Total ridership,
however, cannot be predicted until program details are known. |
15% increase over current ridership levels |
100% increase over current ridership levels |
Cost per passenger ride |
Cost effectiveness is a central goal of YARTS. However, cost per ride
will vary significantly by trip distance, and by amount of fare support provided. Relevant
targets cannot be set until after program details are known. |
Target to be developed for Year 2 |
Target to be developed for Year 2. |
Average percent of seats filled |
Service efficiency is a primary goal of YARTS, and this is one measure
that can be developed now since it can remain fixed while service levels change. |
Average of 40% of seats filled during summer in peak direction. |
Average of 60% of seats filled during summer in peak direction. |
Net change in Valley visitation |
Promoting total visitation to Yosemite and the gateway communities are
central goals for YARTS. Absent a clear management plan for the Valley's parking spaces,
however, it may be impossible to measure performance in this area. |
Maintain historic levels of visitation. |
Increase peak period visitation above what would be possible given
Valley parking availability. |
Customer satisfaction |
A quality experience is critical to YARTS's success. Passenger surveys
should be conducted during each service season to measure customer satisfaction. |
80% of riders surveyed report "satisfied" or "very
satisfied" with their YARTS trip. |
Same. |
Economic viability |
YARTS service cannot be begun or continued beyond the Demonstration
unless it is economically viable. Service levels will also need to be adjusted according
to economic reality. |
YARTS receives multiple bids from service providers. Service providers
agree to meet minimum service levels. Service providers continue service through the two
year Demonstration. |
Same |
Should the demonstration be successful, YARTS may increase the amount service offered by
implementing intercept parking locations, which would allow visitors to leave their cars
in parking lots that are close in to the Valley but that would not disturb sensitive
areas. Intercept parking is an important element of a permanent YARTS service because it
greatly increases the opportunities for visitors to leave their cars behind while visiting
the park. Ultimately, service is anticipated in all four entrance corridors, focused on
intercept parking facilities, but also offering "door-to-door" service for
visitors overnighting in area hotels, or living in the area. The current plan calls for
expanding YARTS, after a successful demonstration, to a system with about 33 buses
operating in all four corridors, carrying about 120,000 riders over the summer season.
CHALLENGES AHEAD
While the YARTS Management Board has recently agreed to target summer 2000 for
implementation of the demonstration service, there are still challenges to be faced before
service can be implemented. The most critical challenges include funding for the
demonstration and permanent service and developing a more formal YARTS organization.
Funding Issues
A critical issue for the YARTS jurisdictions is system funding. Rural counties
generally receive very small amounts of money for transit, as most traditional transit
sources are apportioned based on residential population, and do not consider the impacts
of a major attraction of national scope.
The YARTS demonstration plan as proposed, will cost up to $1.3 M per year for a summer
only demonstration, net of fares, assuming that fare levels are kept to a maximum of $5
per person for a round trip, and that employee cash fares will be free. Costs for a year
round service could increase to over $2.0 M. No funding has been identified to offset the
operating costs for this demonstration, although capital funds are in place for bus stop
improvements.(10)
Figure 5 presents the budget for the current demonstration plan, identifying the costs
for purchased transportation, oversight and marketing and gate fees to the park.
Figure 5
Operating Costs, Ridership and Fare Revenues
YARTS Demonstration Service
Summer Service and Year-Round (Minimum and Maximum)
 |
Summer Only |
Incl.
year-round Serv. on Hwy 140 |
Minimum
Service |
Maximum
Service |
Minimum
Service |
Maximum
Service |
Operating Contractor Costs (1) |
$140,400 |
$325,620 |
$532,275 |
$1,077,195 |
Other Costs (2) |
$450,000 |
$1,020,000 |
$500,000 |
$1,020,000 |
Gate Fees to Park (1) |
$21,971 |
$62,775 |
$79,515 |
$187,453 |
Total Operating Costs |
$612,371 |
$1,408,395 |
$1,111,790 |
$2,284,648 |
Ridership (3) |
Highway 140 |
8,100 |
18,900 |
32,850 |
72,525 |
Highway 120 |
0 |
2,700 |
0 |
2,700 |
Highway 41 |
1,350 |
5,400 |
1,350 |
5,400 |
Total Ridership |
9,450 |
27,000 |
34,200 |
80,625 |
Passenger Fare Revenues (4) |
Highway 140 (5) |
$148,244 |
$43,200 |
$598,050 |
$171,075 |
Highway 120 |
$0 |
$12,825 |
$0 |
$12,825 |
Highway 41 |
$14,127 |
$24,300 |
$13,740 |
$24,300 |
Total Fare Revenues |
$162,371 |
$80,325 |
$611,790 |
$208,200 |
Outside Funding Needed to Cover Total Costs |
$450,000 |
$1,328,070 |
$500,000 |
$2,076,448 |
The National Park Service is expected to fund a portion of this deficit, although the
amount of their contribution is not certain at this time. This contribution will represent
a new level of cooperation between the park and local jurisdictions, and will represent a
tangible recognition of the impacts of the national park on local communities. The Park is
further committed to being a partner with YARTS in their search for other outside funding
opportunities. Federal, State, and local options have been identified as funding sources.
Most promising of these are federal options, including the possibility of a Congressional
earmark to fund the demonstration program. Of course, funding an on-going system will be
an even greater challenge. It is hoped that Congress will recognize the impact of transit
demand generated by National Parks on their rural neighbors and will support legislation
to provide funding for this purpose. The Transit in Parks legislation proposed by Senator
Paul Sarbanes of Maryland would address this need.
Local funding, while not abundant, also offers opportunities to extend public-private
partnerships. Local lodging providers may want to contribute to YARTS in ways that will
support their own business goals, providing fare support for their guests or improving bus
stops that will be used by their guests.
Formalizing the YARTS Organization
YARTS continues to operate under a Memorandum of Understanding that is the legal
equivalent of a "handshake" between the interested parties. While this
organization was sufficient during the planning phase of YARTS, a more formal
organizational structure is desired to protect the member jurisdictions from liability,
and to provide a more sustainable position for contracting and managing service.
YARTS has been working to form a Joint Powers Agency (JPA), which is expected to be
debated by the local jurisdictions within the next few months. This organization,
established by California law, creates an independent legal entity based on the agreement
of the member jurisdictions. Because it is established by State law, the federal agencies,
including the National Park Service can not be signatories to the agreement establishing
the JPA without congressional approval. To allow the Park Service full participation in
YARTS, a second "Cooperative Agreement" between the NPS and YARTS is proposed.
The enabling agreement for the YARTS JPA requires that YARTS disband if this cooperative
agreement is not signed within 60 days after establishing YARTS as a JPA.
It is hoped that these agreements would both be in place, and the JPA established
before entering into agreements with private operators for summer 2000 service.
SUMMARY
YARTS is entering the most critical period of its existence. Under scrutiny from a
skeptical local public, the organization will attempt to provide a regional transit
solution to a problem of national proportions. Demand for visitation to Yosemite increases
annually, and can be accommodated only through the development of innovative
transportation alternatives. The partnerships established through the YARTS process offer
the best hope for maintaining visitation levels needed for the economic well being of the
gateway communities while meeting the Park's goals for restoration and preservation of the
unique resources of Yosemite Valley. As YARTS planning concludes, a new chapter begins.
The lessons learned at Yosemite provide an example to the nation.
ABOUT THE AUTHOR
Bonnie Weinstein Nelson is a founding partner of Nelson\Nygaard Consulting, a firm
specializing in planning and operations of transit systems and other alternative modes. Ms
Nelson has been the Project Manager for the YARTS planning process for over two years. She
has over 20 years experience in transit planning, and holds a BSE Civil Engineering degree
from University of Illinois.
Endnotes
- Yosemite National Park, General Management Plan, 1980
- Dornbusch and Company, 1998
- Day visitors are defined by the Park Service as Park visitors who
are not overnighting within the park, and include those visitors who spend the night in
the local gateway communities.
- General Management Plan, 1980
- A year round service option for Highway 140 is recommended in
Chapter 2.
- In-park service not costed.
- Buses may be provided by NPS. Service costed as an extension of
Wawona/Valley route.
- Cost per rider includes total cost between Wawona and Yosemite
West only.
- Draft Criteria from Demonstration Project Plan, 2000,
Nelson\Nygaard, 1999
- Capital funding of $2.68 M has been received from Interregional
Implementation Funds (IIP) granted through the State Highway Department (Caltrans), and is
being spent on bus stop improvements and the initial work on staging areas.
|
|