Just seven miles long and scarcely a mile wide, Yosemite Valley is one of the most beloved - and most visited - corners on earth. Visitation to the Valley has been growing steadily for over fifteen years at a rate of about 4% annually. In 1995, visitation reached a new peak of about 4.2 million, an increase of 75% over 1983 visitation. While visitation has declined slightly since, that decrease can be directly attributed to both fires and floods that eliminated many lodging opportunities and campsites within the Valley.

Yosemite's growing popularity has come at a price. The vast majority of visitors currently come with their cars. More visitors have led to more cars, which in turn has created parking problems, traffic congestion within the park, and air pollution during peak months. Most people travel to Yosemite to escape such "urban" ills, and many find the same kinds of problems they do at home.

Many constraints prevent the region from accommodating more cars without increased congestion. All roadways leading to Yosemite traverse steep terrain and sensitive habitats. Extensive roadway widening would be cost prohibitive and environmentally challenging. More importantly, Yosemite Valley's small size and limited developable land constrains the construction of additional automobile parking there.

Maintaining convenient access to Yosemite, however, is critical to the economies of all the communities surrounding the Park. Even without parking reductions, if the Park Service were to fully implement its current limit of 6,017 vehicles in the Valley(1), the region would suffer a projected loss of over $7 million annually(2). More importantly, losses in the tourist sector would severely dampen the future economic potential of all sectors of the gateway economies.

The interrelationship between access to the Park and the health of surrounding local economies was emphasized in 1995, when overwhelming visitation during peak summer months resulted in the Park's implementation of what it refers to as its "Restricted Access Plan" or RAP. The plan calls for the closure of entrance gates to the Park when the Valley is highly congested, and when demand for parking exceeds the slightly over 1,200 spaces available for day visitors(3) .

The press coverage of gate closures, and resulting chaos as travelers waited for hours to access the Park created a backlash resulting in declines in tourism that were especially difficult on local businesses, dependant on peak season travel. The need for an alternative that would allow guaranteed access into the park without requiring additional parking to be built within the very limited land area available within the Valley became a mutual goal of both local communities and the National Park.

The objective of the YARTS process, then, is not only to provide additional transportation choices for visitors, residents and employees traveling between gateway communities and the park, but also to ensure the economic vitality of the gateway communities. This is particularly challenging at Yosemite, where the regional system must involve at least four rural counties with no history of local transit use, and must include four primary access routes that are each dominated by travel from a different major metropolitan area. The challenge is further complicated by the fact that the primary roadway through the Park is also one of only a handful of routes through the Sierra Nevada mountains, and must accommodate through traffic as well as park visitors.

Figure 1 shows the Yosemite region, including the five counties that originally founded the YARTS process: Merced, Mariposa, Tuolumne, Mono and Madera.


Yosemite Area Regional Transportation Strategy Project Boundaries

HISTORY OF YARTS

In 1992, the Yosemite Area Regional Transportation Strategy group (YARTS) was established through a Memorandum of Understanding, and included the five counties closest to Yosemite National Park, the Park Service, Caltrans (the California State Highway Department), the State Department of Tourism, and the US Forest Service. The Federal Highway Administration (FHWA) was later added to the YARTS Board . The mission of the group, stated in its original Memorandum of Understanding was: "to pursue through a cooperative effort, improved transportation in the Yosemite region."

Under the Memorandum of Understanding, YARTS members identified four basic goals:

  • Improve transportation service within the Yosemite region;
  • Reduce dependence on the single family vehicle within the Yosemite region;
  • Reduce air quality impacts in the Yosemite region; and
  • Improve economic viability compatible with the character of the Yosemite region.

The YARTS mission has since been refined as follows:

"YARTS will provide a positive alternative method of access to Yosemite National Park, carrying visitors, employees and residents. YARTS service is not intended to replace auto access or trans-Sierra travel, but is intended to provide a viable alternative that offers a positive experience, emphasizing comfort and convenience for riders, while guaranteeing access into the Park."

A brief history of the YARTS organization is provided in Figure 2.

This cooperative forum has already achieved impressive results. Until 1996, YARTS was essentially a discussion forum, without the funding needed for a serious study of transportation options. An initial achievement was the implementation of the Yosemite Area Traveler's Information System (YATI) combining changeable message signs, highway radio information, a website and information kiosks, to create a real time messaging system that may one day support a regional transit network.

Figure 2
Time Line of YARTS Milestones

DATE
EVENT
September 1980
General Management Plan adopted by National Park Service
1992
YARTS MOU Signed
August 1992
Concession Service Plan approved by Park Service including in-Park transportation services
June 1995
Alternative Transportation Modes Feasibility Study Vol IV (BRW Study) released. Recommends staging area at Taft Toe, inside Yosemite Valley
April 1996
Yosemite Transportation Symposium
July 1, 1996
YATI system dedicated
January 1997
Yosemite Floods
June 4, 1997
YARTS Board votes to develop & implement a bus system in near-term, and study feasibility of implementing a rail system in the long-term
May 1997
Flood Relief
Congess ratifies $21 million for emergency in-park transportation and restoration
October 1997
YARTS Phase I Completed
Established regional system goals, developed evaluation criteria, identified three bus-based transportation alternatives.
July 1997
YATI Receives Caltrans Excellence in Transportation Award
for success in working with a wide variety of interest groups and public agencies
June 1998
YARTS Phase II Completed
Selected Preferred Alternative, developed Financial Plan, designed short- and long-term implementation program,, identified need for a JPA.
March 1999
Madera County leaves YARTS
September 1999
YARTS Phase III Detailed Implementation Planning Completed. Develop a detailed business plan, complete final planning tasks, implement early-deployment service, and implement new organizational structure.
May 2000
Initiate Demonstration Service

Concentrated activity on the transit plan began in 1996, when YARTS received funding through a Congressional earmark to study the regional feasibility of alternative mode access to Yosemite National Park. The initial study resulted in two key conclusions:

  • A bus transit service is a viable alternative for providing improved access to Yosemite National Park and the Yosemite region in the short term.
  • A phased approach, which will allow service to be implemented incrementally, is the region's preferred approach.

In addition, the study concluded that rail service may also be viable in the long term, and recommended a rail feasibility study be conducted after completion of the bus implementation study.

In January, 1997, during the initial YARTS study, a severe flood damaged a significant amount of infrastructure in Yosemite Valley and permanently removed a number of camping and parking locations within the Valley. The National Park Service's (NPS) need for a flood recovery plan resulted in a focused land use plan for Yosemite Valley that would implement the goals of the General Management Plan for Yosemite National Park. An initial planning effort, the Valley Implementation Plan has now been expanded into a comprehensive land use plan and environmental study, currently underway, known as the Yosemite Valley Plan. This study, being conducted by the National Park, is independent of the YARTS plan, but will both be informed by the regional transit study and will provide information vital to YARTS implementation.

The combination of regional and federal planning efforts going on in parallel has unfortunately resulted in increasing confusion, especially among local residents with a history of distrust of the Park Service. This distrust led to the accusation that the YARTS process was designed as a "tool" of the Park Service and their stated goal of removing cars from the National Park(4). Madera County resigned its position on the YARTS Management Board in early 1999, after significant protest in that County suggested that the YARTS process was simply a first step in an overall ban on autos in the Valley, which would have an obvious negative impact on local economies.

While the loss of Madera County, and continued protest in some communities has slowed implementation of YARTS service, planning is on-going for a May, 2000 demonstration of a regional transit service.


YARTS PLANNING PRINCIPLES

Planning for a regional transit service among a skeptical constituency has been a significant challenge for the local elected officials who comprise the majority of the YARTS Management Board. To ensure local residents that the solution to this national problem would not negatively impact local communities, the Management Board adopted Planning Principles earlier in 1999.

Among the key principles included in this document:

Voluntary Service
- The YARTS system should be a voluntary system that encourages people to take the bus as an easy alternative to driving.

Incentives
- Policies for encouraging ridership include fare reductions for youths, seniors, local residents and Park/concessionaire employees, as well as guaranteed access to all areas in the Park.

Convenience and Quality
- A reliable service with convenient connections, generous service hours and clear schedules is essential. Locating stops at key lodging locations will minimize the need to drive to intercept locations that will require more time for development.

Exceptional Vehicles
- The YARTS buses should be very comfortable. Suggested amenities include storage for large gear such as bicycles and strollers, multi-channel audio programming, reclining seats with overhead storage for small items, and large windows that make the most of the area's spectacular scenery.

Competitive Pricing
- Low fares should ensure that the bus is cheaper than driving. Transit fares must compete with a $20 per vehicle admission to Yosemite, which is currently good for 7 days.

Commuter Service
- Making YARTS a viable commute alternative for Park and concessionaire employees will be vital, particularly in YARTS' early stages. Expanded service hours during the peak season would assure that late-night and early-morning shift workers would be able to utilize the service.

Seamless Marketing
- The YARTS ride should be synonymous with the "Yosemite experience," with integrated admission tickets and bus fare and widespread system marketing.

COOPERATION WITH THE NATIONAL PARK

The YARTS planning effort represents a unique forum for cooperation between the National Park and its neighbors in the areas of transportation and access. This is a major departure from past efforts in the region which often resulted in an "us-them" struggle between gateway communities and the Park Service, and among the various gateways themselves. By speaking with one voice the gateway communities have influenced park service policies.

The YARTS planning process has recommended and the park has adopted several key policies that will enhance YARTS chances for success:

A definition of transit service has been adopted that is distinct from tour bus operations. Tour buses are viewed as part of the congestion problem at Yosemite because they stop and idle at various attractions throughout the park, unloading, loading and waiting for their group to return. The definition of a "transit" trip includes regular stops outside of the park on a reliable schedule, the ability to board the bus without a reservation, and, most important to the park, a "stop, drop, and go" operation that does not involve waiting or idling along the way.

Transit buses will be given "privileges" that are not given to either tour buses or cars at the National Park. Beyond adopting the definition of a transit bus, the Park has indicated that transit operators will be "sanctioned" or permitted only through the YARTS process. Transit operators will receive priority access to the park. Their "privileges" will include: elimination of the $300 vehicle entrance fee currently charged to tour buses; the ability to "jump queues" at entrance gates; reduced entrance fees for individuals to no more than $3 per person and $6 per group; and the ability to stop at key attraction points throughout the park and Valley.

An employee transportation program will be a high priority for the Park Service and its concessionaire. Public input strongly suggested that the local communities would not accept a transit service for its guests that did not also serve to remove employee cars from the park. An additional impact of the Yosemite Valley Plan is likely to be a reduction of employee housing units in the Valley, as well as a substantial reduction in the number of parking spaces available to commuting employees, making alternative transportation a critical part of the park's own plan. While no final decision has been made, the Park is committed to providing a comprehensive approach to employee transportation, making Yosemite a leader among national parks in this area.

The Park is committed to contributing to the funding of YARTS and to its success. Over time, the Park has come to see YARTS as an integral part of its future. As demand for access to the park continues to increase despite limited parking and automobile infrastructure, YARTS has been recognized as the only way to maintain visitation levels without further damaging the environment. The National Park Service is committed to the YARTS process, and has agreed to provide funding support for YARTS to ensure its success. Few National Parks in the country have funded transportation projects outside of their boundaries.

This level of commitment has substantially changed the relationships between the gateway counties and the National Park. While a few years of cooperation can not eliminate a history of competing goals, the YARTS process offers the promise of a closer relationship between the Park and its neighbors.

THE DEMONSTRATION PLAN

Developing a transportation plan for the Yosemite region is a substantial challenge that goes beyond geography and the number of jurisdictions involved. The rural gateway counties have no history of public transit service, except for very small focused transit systems that cater primarily to elders and persons with disabilities. In fact, many local residents moved to the mountain communities to avoid urban ills they associate with public transit

Other concerns raised by the public in numerous workshops and input sessions include:

Concern over "big government" approaches to solving problems. Even those local constituents who believe congestion and access to Yosemite is a regional problem are skeptical about heavy handed government solutions. They fear that even a small transit service will be a precursor to a larger system that will require riders to leave their cars behind, and will ultimately make Yosemite less appealing as a tourist destination. A common refrain says that "if it was a good idea, business would do it", and since there is only a very small transit market today, transit must not be a good idea. Local residents expressed concern about grant funding or public investment in what they see as a largely private concern, and they expressed a belief that local jurisdictions would ultimately be made to pay for the program.

Environmental Concern. Local residents are concerned that large bus fleets, especially diesel powered fleets will have a negative impact on local environments. The public cites recent California EPA findings which identify diesel exhaust particulate emissions as a carcinogen.

Economic Concern. Local business owners expressed concern that YARTS would ultimately become the only way to access the park, and suggest that the YARTS process is a tool of the park service's plan to ban all cars from the Yosemite Valley. Under these circumstances, business owners are concerned that visitors will stay away from the region, rather than make the trip by transit.

The plan for transit service in the Yosemite region reflects the input received from the public and balances their concerns with the need to meet the objectives established for YARTS. The result is a proposal for a two-year demonstration program, which will begin operation during the summer, 2000. Under this proposal, YARTS will not be the direct provider of transit services, but will serve as a "brokering" agency, establishing service criteria and providing subsidies as available to encourage higher levels of service and lower fares than would be offered by private operators on their own. The service will actually be provided by the private sector, who will negotiate with YARTS to determine the final schedules and other operating details.

The demonstration project plan provides minimum and maximum service levels expected to be operated during the two-year demonstration period. Minimum service levels presume that no funding is available to subsidize service or reduce fares. A very modest program could still be offered at "market rates" providing connecting services from Amtrak and serving employees. Maximum service levels are estimated based on subsidy levels that would reduce the cost per visitor to $5 for a round trip, including the park's gate fee, and would eliminate the cash fare for employees. Higher levels of service can be offered under this scenario, as demand will significantly increase.

The final level of service on each corridor will be negotiated with the actual service providers through a request for proposal (RFP) process. RFPs are expected to be issued during the fall of 1999 for a summer 2000 service implementation.

Figure 3 presents the service characteristics for minimum and maximum service levels on each of the corridors that will receive demonstration transit service. Service will be offered at bus stops identified by each jurisdiction, located conveniently to lodging sites in the gateway communities. The initial target market will be lodgers who can leave their car at their lodging location while visiting the park. Employees will also be targeted, especially on Highway 140 where concentrations of employees exist. Highway 120 West is not included in the demonstration plan because Tuolumne County has not identified bus stop locations at this time. Should those stops be added, additional transit service would be offered from Groveland into the Park.


Figure 3
Demonstration Service Plan

Corridor
Measure
Minimum service
Maximum service
Highway 140
Communities served
El Portal, Midpines, Mariposa, Catheys Valley, Merced
El Portal, Midpines, Mariposa, Catheys Valley, Merced
Total daily round trips
6
14+
Hours
6:00 a.m. to 8:30 p.m.
5:00 a.m. to 11:00 p.m.
Summer revenue hours
2,100
5,500
Total summer(5) service cost (no fare recovery)
$130,000
$260,000
Base frequency
Limited midday service
Hourly from El Portal and Mariposa
Peak hour frequency
Hourly from El Portal
Half-hourly from El Portal
Summer ridership
8,000
19,000
Buses Required
6
8
Cost per ride
$16
$12
Highway 120
Communities served
Tuolumne Meadows to Valley only (in-park service)
Lee Vining to Tuolumne Meadows also
Total daily round trips
0 to Lee Vining

1 to Tuolumne Meadows

2 to Lee Vining

4 to Tuolumne Meadows

Hours
9:00 a.m. to 6:00 p.m.
9:00 a.m. to 6:00 p.m.
Summer revenue hours(6)
n/a
315 (does not include YCS service between Valley and Tuolumne Meadows)
Highway 120

(cont.)

Total summer service cost (no fare recovery)
n/a
$19,000
Base frequency
n/a
Peak only
Peak hour frequency
n/a
2 round trips
Summer ridership
n/a
2,700
Buses required
0
2
Cost per ride
n/a
$8
Highway 41
Communities served
Wawona, Yosemite West
Wawona, Yosemite West
Total daily round trips
1
4
Hours
9:00 a.m. to 7:00 p.m.
9:00 a.m. to 7:00 p.m.
Summer revenue hours
600
1,200
Total summer service cost (no fare recovery)
$12,000
$49,000
Base frequency
Peak service only
Peak service only
Peak hour frequency
One round trip a day
Hourly peak service
Summer ridership
1,300
5,400
Buses required(7)
1
3
Cost per ride(8)
$9
$9
Summary All Corridors
Total Daily Round Trips
7
20
Buses required
7
13
Service hours
2,700
7,015
Summer ridership
9,300
27,100
Total cost (summer)
$142,000
$328,000
Average Cost/Rider
$15.27
$12.10

The demonstration service is expected to operate for a two-year period, with increasing performance expectations over the two years. Identifying criteria for evaluating the demonstration service was critical to gaining support, because it demonstrated the fact that service could be altered or terminated if it failed to meet expectations. The recommended criteria for evaluating the demonstration are modest, ensuring that the demonstration is not expected to perform at a level that could only be expected of a fully developed and established system. The proposed performance criteria are presented in Figure 4 .

Figure 4
Demonstration Service Performance Criteria (9)


Performance measure
Applicability to YARTS
Minimum target with no employee transportation or fare support
Upper limit with employee transportation and visitor fare support
Total ridership
Maximizing ridership is a central goal of YARTS. Total ridership, however, cannot be predicted until program details are known.
15% increase over current ridership levels
100% increase over current ridership levels
Cost per passenger ride
Cost effectiveness is a central goal of YARTS. However, cost per ride will vary significantly by trip distance, and by amount of fare support provided. Relevant targets cannot be set until after program details are known.
Target to be developed for Year 2
Target to be developed for Year 2.
Average percent of seats filled
Service efficiency is a primary goal of YARTS, and this is one measure that can be developed now since it can remain fixed while service levels change.
Average of 40% of seats filled during summer in peak direction.
Average of 60% of seats filled during summer in peak direction.
Net change in Valley visitation
Promoting total visitation to Yosemite and the gateway communities are central goals for YARTS. Absent a clear management plan for the Valley's parking spaces, however, it may be impossible to measure performance in this area.
Maintain historic levels of visitation.
Increase peak period visitation above what would be possible given Valley parking availability.
Customer satisfaction
A quality experience is critical to YARTS's success. Passenger surveys should be conducted during each service season to measure customer satisfaction.
80% of riders surveyed report "satisfied" or "very satisfied" with their YARTS trip.
Same.
Economic viability
YARTS service cannot be begun or continued beyond the Demonstration unless it is economically viable. Service levels will also need to be adjusted according to economic reality.
YARTS receives multiple bids from service providers. Service providers agree to meet minimum service levels. Service providers continue service through the two year Demonstration.
Same

Should the demonstration be successful, YARTS may increase the amount service offered by implementing intercept parking locations, which would allow visitors to leave their cars in parking lots that are close in to the Valley but that would not disturb sensitive areas. Intercept parking is an important element of a permanent YARTS service because it greatly increases the opportunities for visitors to leave their cars behind while visiting the park. Ultimately, service is anticipated in all four entrance corridors, focused on intercept parking facilities, but also offering "door-to-door" service for visitors overnighting in area hotels, or living in the area. The current plan calls for expanding YARTS, after a successful demonstration, to a system with about 33 buses operating in all four corridors, carrying about 120,000 riders over the summer season.

CHALLENGES AHEAD

While the YARTS Management Board has recently agreed to target summer 2000 for implementation of the demonstration service, there are still challenges to be faced before service can be implemented. The most critical challenges include funding for the demonstration and permanent service and developing a more formal YARTS organization.
Funding Issues

A critical issue for the YARTS jurisdictions is system funding. Rural counties generally receive very small amounts of money for transit, as most traditional transit sources are apportioned based on residential population, and do not consider the impacts of a major attraction of national scope.

The YARTS demonstration plan as proposed, will cost up to $1.3 M per year for a summer only demonstration, net of fares, assuming that fare levels are kept to a maximum of $5 per person for a round trip, and that employee cash fares will be free. Costs for a year round service could increase to over $2.0 M. No funding has been identified to offset the operating costs for this demonstration, although capital funds are in place for bus stop improvements.(10)

Figure 5 presents the budget for the current demonstration plan, identifying the costs for purchased transportation, oversight and marketing and gate fees to the park.



Figure 5
Operating Costs, Ridership and Fare Revenues
YARTS Demonstration Service
Summer Service and Year-Round (Minimum and Maximum)

Summer Only
Incl. year-round Serv. on Hwy 140
Minimum Service
Maximum Service
Minimum Service
Maximum Service
Operating Contractor Costs (1)
$140,400
$325,620
$532,275
$1,077,195
Other Costs (2)
$450,000
$1,020,000
$500,000
$1,020,000
Gate Fees to Park (1)
$21,971
$62,775
$79,515
$187,453
Total Operating Costs
$612,371
$1,408,395
$1,111,790
$2,284,648
Ridership (3)
Highway 140
8,100
18,900
32,850
72,525
Highway 120
0
2,700
0
2,700
Highway 41
1,350
5,400
1,350
5,400
Total Ridership
9,450
27,000
34,200
80,625
Passenger Fare Revenues (4)
Highway 140 (5)
$148,244
$43,200
$598,050
$171,075
Highway 120
$0
$12,825
$0
$12,825
Highway 41
$14,127
$24,300
$13,740
$24,300
Total Fare Revenues
$162,371
$80,325
$611,790
$208,200
Outside Funding Needed to Cover Total Costs
$450,000
$1,328,070
$500,000
$2,076,448

(1) Refer to Figure 4-1.

(2) Includes JPA Administration, Marketing, Planning & Evaluation and YATI Upgrades

(3) Total ridership includes traveler and employee riders.

(4) Passenger fare revenues have two major assumptions for maximum service levels:

  1. employee ridership pays no cash fares and that employer fully subsidizes cost of trip
  2. Visitor ridership pays $5 fare which includes gate fee.

(5) Includes existing Mariposa County subsidy.

 

The National Park Service is expected to fund a portion of this deficit, although the amount of their contribution is not certain at this time. This contribution will represent a new level of cooperation between the park and local jurisdictions, and will represent a tangible recognition of the impacts of the national park on local communities. The Park is further committed to being a partner with YARTS in their search for other outside funding opportunities. Federal, State, and local options have been identified as funding sources. Most promising of these are federal options, including the possibility of a Congressional earmark to fund the demonstration program. Of course, funding an on-going system will be an even greater challenge. It is hoped that Congress will recognize the impact of transit demand generated by National Parks on their rural neighbors and will support legislation to provide funding for this purpose. The Transit in Parks legislation proposed by Senator Paul Sarbanes of Maryland would address this need.

Local funding, while not abundant, also offers opportunities to extend public-private partnerships. Local lodging providers may want to contribute to YARTS in ways that will support their own business goals, providing fare support for their guests or improving bus stops that will be used by their guests.

Formalizing the YARTS Organization

YARTS continues to operate under a Memorandum of Understanding that is the legal equivalent of a "handshake" between the interested parties. While this organization was sufficient during the planning phase of YARTS, a more formal organizational structure is desired to protect the member jurisdictions from liability, and to provide a more sustainable position for contracting and managing service.

YARTS has been working to form a Joint Powers Agency (JPA), which is expected to be debated by the local jurisdictions within the next few months. This organization, established by California law, creates an independent legal entity based on the agreement of the member jurisdictions. Because it is established by State law, the federal agencies, including the National Park Service can not be signatories to the agreement establishing the JPA without congressional approval. To allow the Park Service full participation in YARTS, a second "Cooperative Agreement" between the NPS and YARTS is proposed. The enabling agreement for the YARTS JPA requires that YARTS disband if this cooperative agreement is not signed within 60 days after establishing YARTS as a JPA.

It is hoped that these agreements would both be in place, and the JPA established before entering into agreements with private operators for summer 2000 service.


SUMMARY

YARTS is entering the most critical period of its existence. Under scrutiny from a skeptical local public, the organization will attempt to provide a regional transit solution to a problem of national proportions. Demand for visitation to Yosemite increases annually, and can be accommodated only through the development of innovative transportation alternatives. The partnerships established through the YARTS process offer the best hope for maintaining visitation levels needed for the economic well being of the gateway communities while meeting the Park's goals for restoration and preservation of the unique resources of Yosemite Valley. As YARTS planning concludes, a new chapter begins. The lessons learned at Yosemite provide an example to the nation.


ABOUT THE AUTHOR

Bonnie Weinstein Nelson is a founding partner of Nelson\Nygaard Consulting, a firm specializing in planning and operations of transit systems and other alternative modes. Ms Nelson has been the Project Manager for the YARTS planning process for over two years. She has over 20 years experience in transit planning, and holds a BSE Civil Engineering degree from University of Illinois.


Endnotes

  1. Yosemite National Park, General Management Plan, 1980
  2. Dornbusch and Company, 1998
  3. Day visitors are defined by the Park Service as Park visitors who are not overnighting within the park, and include those visitors who spend the night in the local gateway communities.
  4. General Management Plan, 1980
  5. A year round service option for Highway 140 is recommended in Chapter 2.
  6. In-park service not costed.
  7. Buses may be provided by NPS. Service costed as an extension of Wawona/Valley route.
  8. Cost per rider includes total cost between Wawona and Yosemite West only.
  9. Draft Criteria from Demonstration Project Plan, 2000, Nelson\Nygaard, 1999
  10. Capital funding of $2.68 M has been received from Interregional Implementation Funds (IIP) granted through the State Highway Department (Caltrans), and is being spent on bus stop improvements and the initial work on staging areas.